Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13655753
| No.13655753
- Product Categories
- Friendly Links
How to mixing equipment bought its installation test
2015-07-17 Reads : 36
Stirring devices are also known as the agitation tank, mixing equipment for this in its continuous improvement by experts, to make it more adapted to corporate needs, but for such mixing equipment, the test should be how to install it ? How should we do it just to make it more effective? 1, the device should be installed on a level concrete foundation with anchor bolts. 2, the installation should pay attention to the main body vertical and horizontal. 3. After installation check all parts for loose bolts and host the doors are tight and, if requested to tighten. 4, according to the configuration of power equipment and power line control switch. 5, the inspection is completed, empty load test, test the normal production. What about the mixing equipment still exist doubt, Xiao Bian will patiently for you to answer every question.
keywords: Mixing Equipment , , ,
Admin>>>
You are the 28967 visitor
Copyright © GuangDong ICP No. 10089450, Dezhou Dekai slowdown transmission Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 28967 visitor
Copyright © GuangDong ICP No. 10089450, Dezhou Dekai slowdown transmission Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
